James Fisher Offshore (JFO), a life of field provider of specialist offshore engineering solutions, has supported Saudi EPC business NPCC to deliver time and cost savings in offshore decommissioning operations in the Middle East
Jacket removal in Saudi Arabia. (Image source: JFO)
Recent reporting from its ongoing project in support of NPCC demonstrates a 60 per cent reduction in overall cutting time utilising its innovative ultra-high-pressure (UHP) abrasive water jet internal cutting system, according to JFO.
This system minimises equipment requirements and the need to de-water, while the cut verification system ensures operator and customer certainty, minimising the risk of stitching and, ultimately, reducing risk of over-run on high-cost projects.
Jack Davidson, managing director at JFO, said, “It is fantastic to be working in support of companies like NPCC that recognise our expertise in deploying the correct technology and equipment to optimise their results.
Our experience and innovations are delivering tangible time and cost savings for our customers, for example reducing vessel time, back deck and personnel requirements and enhancing project assurance.
It is exciting to see the top tier of the supply chain regionally such as NPCC embrace our new technologies and innovative ways of working, benefiting from the value we are delivering for them and to the overall decommissioning landscape.”
Stand 13572, Hall 13.