twitter linkedinfacebookacp contact us

Yokogawa win control systems order at UAE power and desalination station

Industry

Yokogawa Electric Corporation has announced that it had received an order from the Sharjah Electricity and Water Authority (SEWA) to provide control systems for the Layyah Power and Desalination Station 

Yokogawa Electric Corporation announced on 16 January 2017 that it has received an order from Sharjah Electricity and Water Authority (SEWA) to provide control systems for the Layyah Power and Desalination Station.

For this particular project, Yokogawa Middle East and Africa will deliver the Centum VP integrated production control system for the boiler, turbine governor, turbine protection system at the desalination plant. In addition, the ProSafe-RS safety instrumented system will be deployed for burner management and boiler protection. 

Yokogawa will also deliver field instruments such as the DPharp EJA series differential pressure/pressure transmitter, continuous emission monitoring systems (CEMS), and steam and water analysis systems (SWAS). 

Yokogawa Middle East and Africa will provide support for the installation and commissioning of these systems, with the contracted work scheduled to be completed by September 2017. This is Yokogawa’s first ever distributed control system order for a power and desalination plant in the UAE.